Answer:
Part A)
About 0.51% per year.
Part B)
About 0.30% per year.
Part C)
About 28.26%.
Step-by-step explanation:
We are given that the population of Americans age 55 and older as a percentange of the total population is approximated by the function:
[tex]f(t) = 10.72(0.9t+10)^{0.3}\text{ where } 0 \leq t \leq 20[/tex]
Where t is measured in years with t = 0 being the year 2000.
Part A)
Recall that the rate of change of a function at a point is given by its derivative. Thus, find the derivative of our function:
[tex]\displaystyle f'(t) = \frac{d}{dt} \left[ 10.72\left(0.9t+10\right)^{0.3}\right][/tex]
Rewrite:
[tex]\displaystyle f'(t) = 10.72\frac{d}{dt} \left[(0.9t+10)^{0.3}\right][/tex]
We can use the chain rule. Recall that:
[tex]\displaystyle \frac{d}{dx} [u(v(x))] = u'(v(x)) \cdot v'(x)[/tex]
Let:
[tex]\displaystyle u(t) = t^{0.3}\text{ and } v(t) = 0.9t+10 \text{ (so } u(v(t)) = (0.9t+10)^{0.3}\text{)}[/tex]
Then from the Power Rule:
[tex]\displaystyle u'(t) = 0.3t^{-0.7}\text{ and } v'(t) = 0.9[/tex]
Thus:
[tex]\displaystyle \frac{d}{dt}\left[(0.9t+10)^{0.3}\right]= 0.3(0.9t+10)^{-0.7}\cdot 0.9[/tex]
Substitute:
[tex]\displaystyle f'(t) = 10.72\left( 0.3(0.9t+10)^{-0.7}\cdot 0.9 \right)[/tex]
And simplify:
[tex]\displaystyle f'(t) = 2.8944(0.9t+10)^{-0.7}[/tex]
For 2002, t = 2. Then the rate at which the percentage is changing will be:
[tex]\displaystyle f'(2) = 2.8944(0.9(2)+10)^{-0.7} = 0.5143...\approx 0.51[/tex]
Contextually, this means the percentage is increasing by about 0.51% per year.
Part B)
Evaluate f'(t) when t = 17. This yields:
[tex]\displaystyle f'(17) = 2.8944(0.9(17)+10)^{-0.7} =0.3015...\approx 0.30[/tex]
Contextually, this means the percetange is increasing by about 0.30% per year.
Part C)
For this question, we will simply use the original function since it outputs the percentage of the American population 55 and older. Thus, evaluate f(t) when t = 17:
[tex]\displaystyle f(17) = 10.72(0.9(17)+10)^{0.3}=28.2573...\approx 28.26[/tex]
So, about 28.26% of the American population in 2017 are age 55 and older.
find the value of x. help with geometry pls
Answer:
Find the value of x:-
To find Y, use Pythagorean theorem:- [tex]c^{2} =a^{2} +b^{2}[/tex]
[tex](2.1)^{2} =y^{2} +(1.4)^{2}[/tex]
[tex]2.1^{2}=4.41[/tex]
[tex]1.4^{2} =1.96[/tex]
[tex]4.41=y^{2} +1.96[/tex]
subtract 1.96 from both sides
[tex]2.45=y^{2}[/tex]
[tex]y=1.5652[/tex]
Now, to find x:-
[tex]x=y+y[/tex]
[tex]= 1.5632+1.5652[/tex]
[tex]x=3.1 \: ft[/tex]
~OAmalOHopeO
how many wall are there in your room? what are the shape of the floor and ceiling in your room ? how can you find the area of each shape?prepare the answer. present the conclusion in the form of report. plz answer the question in right.how many wall are there in your room? what are the shape of the floor and ceiling in your room ? how can you find the area of each shape?prepare the answer. present the conclusion in the form of report. plz answer the question in right. plz answer the question steps by step.
There is a path of width 2.5 m inside around a square garden of length 45m.
(a) Find the area of the path.
(b) How many tiles will be required to pave in the path by the square tiles of length 0.5m? Find it.
Help ! 도와주세요, 제발 :(
Answer:
2.5+2.5+45+45
=95.0m
therefore area of the square= 95.0m
45m×0.5=45.5÷95=
Step-by-step explanation:
2.5m
2.5 m tiles are required
[tex]area = 2.5 \times 45 = 192.5 \: squared \: cenimetre \\ \\ no \: of \: tiles = 0.5 \times 0.5 = 0.25 \\ 192.5 \div 0.25 = 770tiles[/tex]
Find the 100th term of the sequence 4, 7, 10, 13...
a) 301
b) 313
c) 281
d) 279
Answer:
A
Step-by-step explanation:
The first term of the sequence is 4, the common difference is 3. So the equation of this sequence is 4+(n-1)*3 or 1+3*n. Plug in n=100
The cylinders shown are similar. What is the volume of the larger cylinder?
Step-by-step explanation:
Ratio of height (large to small) = ratio of radii (large to small).
(h / 14) = (8 / 2)
h / 14 = 4
h = 56
The height of the larger cylinder is 56m.
Volume of cylinder is
V = πr2h
V = π(8)2(56)
V = 3584π
4(x+4) =2x-1
8
Show work
Answer:
4(x+4) =2x-18
4x+16=2x‐18
4x–2x= –18 –16
2x= – 34
x= –34/2
x= – 17
I hope I helped you^_^
Step-by-step explanation:
[tex]thank \: you[/tex]
a. 1140
b. 1130
c. 1120
d. 115
Answer:
1130
Step-by-step explanation:
1109+7 = 1116
1116+7 = 1123
Adding 7 each time
1123+7 = 1130
Show that Reſiz) = -Im(z)
Step-by-step explanation:
[tex]re(i(x + yi) = - im(x + yi) \\ re(xi - y) = - im(x + yi) \\ - y = - (y) \\ - y = - y \\ proved \: is \: correct[/tex]
Infues Gentamicin 100 mg in 100ml in 15 minutes. What will you set the infusion pump at ml/hr
9514 1404 393
Answer:
400 mL/h
Step-by-step explanation:
The required rate is ...
(100 mL)/(1/4 h) = 100×(4/1) mL/h = 400 mL/h
Convert the following equation
into standard form.
y = 7 - 7x
[?]x + y = []
Answer:
[tex]y = 7 - 7x \\ y + 7x = 7 \\ 7x + y = 7[/tex]
Answer:
7x + y = 7
Step-by-step explanation:
The equation of a line in standard form is
Ax + By = C ( A is a positive integer and B, C are integers )
Given
y = 7 - 7x ( add 7x to both sides )
7x + y = 7 ← in standard form
Determine whether the integral is divergent or convergent. If it is convergent, evaluate it.
[infinity]
â« e^-1.3x dx
1
A family has a day of 7 activities planned: shopping, picnic, hiking, swimming, bike ride, video games, and movie. To make it more adventurous they decide to randomly pick the order of the activities out of a hat. Find the probability that bike ride and movie are chosen consecutively, in either order.
Answer:
[tex]Pr= \frac{1}{21}[/tex]
Step-by-step explanation:
Given
[tex]n(S) = 7[/tex] --- number of games
Required
Probability of bike and movie in consecutive order
This probability is represented as:
[tex]Pr = P(Bike\ and\ Movie) \ or\ P(Movie\ or\ Bike)[/tex]
So, we have:
[tex]Pr = P(Bike\ and\ Movie) \ +\ P(Movie\ or\ Bike)[/tex]
The probability is an illustration of selection without replacement;
So, we have:
[tex]P(Bike\ and\ Movie) = P(Bike) * P(Movie)[/tex]
[tex]P(Bike\ and\ Movie) = \frac{n(Bike)}{n(S)} * \frac{n(Movie)}{n(S) - 1}[/tex] ---- without replacement
Bike and Movie appear in the game list 1 time.
So, the equation becomes
[tex]P(Bike\ and\ Movie) = \frac{1}{7} * \frac{1}{7 - 1}[/tex]
[tex]P(Bike\ and\ Movie) = \frac{1}{7} * \frac{1}{6}[/tex]
[tex]P(Bike\ and\ Movie) = \frac{1}{42}[/tex]
Similarly,
[tex]P(Movie\ and\ Bike) = \frac{1}{42}[/tex]
So, we have:
[tex]Pr = P(Bike\ and\ Movie) \ +\ P(Movie\ or\ Bike)[/tex]
[tex]Pr= \frac{1}{42}+\frac{1}{42}[/tex]
Take LCM
[tex]Pr= \frac{1+1}{42}[/tex]
[tex]Pr= \frac{2}{42}[/tex]
[tex]Pr= \frac{1}{21}[/tex]
plez halppp mehh ;-;
Answer:
False
True
True
Step-by-step explanation:
Angle 1 cannot be equal to angle 4. Even by just viewing one can see that they can't be equal.
Angle 1 and 2 when combined give a 90 degree angle going from a to c.
Angle 3 and 4 form a 180 degree angle.
HOPE THIS HELPED
Simplify the following expression.
3(2k + 3) -8k + 5 + 5
Answer:
Step-by-step explanation:
3*(2k + 3) - 8k + 5 + 5 Remove the brackets on the left
6k + 9 - 8k + 5 + 5 Combine like terms
6k-8k+9 + 5 + 5
-2k + 19
a certain number plus two is five find the number
x=3
Step-by-step explanation:
x+2=5
x=5-2
x=3
Complete the coordinate table for the given equation.
Xy=-4
Step-by-step explanation:
X= -4,-2,2,4 (respectively)
Y=4,-4 (respectively)
hope it helps
√10 Multiple √15 is equal to
(a) 6√5
(b) √30
(c) √25
step by step
Solve :-
dont answer stantham
[tex]\\ \sf\longmapsto \sqrt{10}\times \sqrt{15}[/tex]
[tex]\\ \sf\longmapsto \sqrt{10\times 15}[/tex]
[tex]\\ \sf\longmapsto \sqrt{2\times 5\times 3\times 5}[/tex]
[tex]\\ \sf\longmapsto \sqrt{5\times 5\times 6}[/tex]
[tex]\\ \sf\longmapsto 5\sqrt{6}[/tex]
None of the above should be 4th option
Lynbrook West, an apartment complex, has 100 two-bedroom units. The monthly profit (in dollars) realized from renting out x apartments is given by the following function. p(x)=-12x^2+2160x-59000 To maximize the monthly rental profit, how many units should be rented out? units What is the maximum monthly profit realizable?
Answer:
To maximize the monthly rental profit, 90 units should be rented out.
The maximum monthly profit realizable is $38,200.
Step-by-step explanation:
Vertex of a quadratic function:
Suppose we have a quadratic function in the following format:
[tex]f(x) = ax^{2} + bx + c[/tex]
It's vertex is the point [tex](x_{v}, y_{v})[/tex]
In which
[tex]x_{v} = -\frac{b}{2a}[/tex]
[tex]y_{v} = -\frac{\Delta}{4a}[/tex]
Where
[tex]\Delta = b^2-4ac[/tex]
If a<0, the vertex is a maximum point, that is, the maximum value happens at [tex]x_{v}[/tex], and it's value is [tex]y_{v}[/tex].
In this question:
Quadratic equation with [tex]a = -12, b = 2160, c = -59000[/tex]
To maximize the monthly rental profit, how many units should be rented out?
This is the x-value of the vertex, so:
[tex]x_{v} = -\frac{b}{2a} = -\frac{2160}{2(-12)} = \frac{2160}{24} = 90[/tex]
To maximize the monthly rental profit, 90 units should be rented out.
What is the maximum monthly profit realizable?
This is p(90). So
[tex]p(90) = -12(90)^2 + 2160(90) - 59000 = 38200[/tex]
The maximum monthly profit realizable is $38,200.
Given: AABC, AC = 5
m C = 90°
m A= 22°
Find: Perimeter of AABC
A
C
B
9514 1404 393
Answer:
perimeter ≈ 12.4 units
Step-by-step explanation:
The side adjacent to the angle is given. The relationships useful for the other two sides are ...
Tan = Opposite/Adjacent
Cos = Adjacent/Hypotenuse
From these, we have ...
opposite = 5·tan(22°) ≈ 2.02
hypotenuse = 5/cos(22°) ≈ 5.39
Then the perimeter is ...
P = a + b + c = 2.02 + 5 + 5.39 = 12.41
The perimeter of ∆ABC is about 12.4 units.
150 is 40% of what number
Step-by-step explanation:
hope it helps youu.........
Express the speed of 0.0000000015 seconds in scientific notation
[tex]\\ \sf\longmapsto 0.0000000015[/tex]
[tex]\\ \sf\longmapsto 0.0015\times 10^{-6}s[/tex]
[tex]\\ \sf\longmapsto 0.015\times 10^{-7}s[/tex]
[tex]\\ \sf\longmapsto 0.15\times 10^{-8}s[/tex]
[tex]\\ \sf\longmapsto 1.5\times 10^{-9}s[/tex]
Answer: 0.0000000015 = 1.5 × 10⁻⁹
Concept:
When converting an integer to scientific notation:
- If the number is ≥1, then count the moves of the decimal point to the right until the number is 0<number<10. The number of moves will be the exponent that is positive.
- For example: If converting 300, since there are two moves until it is left with 0<3<10. Thus, the scientific notation will be 3 × 10²
- If the number is <1, then count the moves of the decimal point to the left until the number is 0<number<10. The number of moves will be the exponent that is negative.
- For example: If converting 0.004, since there are three moves until it is left with 0<4<10. Thus, the scientific notation will be 4 × 10⁻³
Solve:
0.0000000015
The decimal point needs to move 9 times to the left to get a number that is between 0 and 10. The number is 1.5.
Thus, the scientific notion of 0.0000000015 will be 1.5 × 10⁻⁹
Hope this helps!! :)
Please let me know if you have any questions
on a particular day, a man spent 12 minutes more driving to his office than driving home. His average speed from home to office is 12km/h and from office to home is 60m/h .How far is the man home to his office
Answer:
distance between home and office = 3 km
Step-by-step explanation:
3. Find the least common denominator for the group of denominators using the method of prime numbers. 45, 75, 63
We have to find LCM
3 | 45,75,63
3 | 15,25,21
5 | 5,25,7
5 | 1,5,7
7 | 1,1,7
LCM=3×3×5×5×7=1575
The least common denominator for the group of denominators using the method of prime numbers is 1575.
What is least common multiple?LCM stands for Least Common Multiple. It is a method to find the smallest common multiple between any two or more numbers. A factor is one of the numbers that multiplies by a whole number to get that number.
For the given situation,
The numbers are 45, 75, 63
Prime factors of 45 = [tex]3,3,5[/tex]
Prime factors of 75 = [tex]3,5,5[/tex]
Prime factors of 63 = [tex]3,3,7[/tex]
Then the LCM can be found by, first take the common factors then multiple the remaining factors as,
⇒ [tex](3)(3)(5)(5)(7)[/tex]
⇒ [tex]1575[/tex]
Hence we can conclude that the least common denominator for the group of denominators using the method of prime numbers is 1575.
Learn more about least common multiple here
https://brainly.com/question/24859913
#SPJ2
Select the correct answer from each drop-down menu.
The table represents function f, and the graph represents function g.
-2
- 1
1
2
3
4
0
х
Ax)
7
0
-5
-8
-9
-8
-5
у
A
6
4
2
g
X
.
-21
2
2
The line of symmetry for function fis
and the line of symmetry for function gis
The y-intercept of function fis
the y-intercept of function g.
Over the interval [2, 4], the average rate of change of function fis
the average rate of change of function g.
Answer:
Line of symmetry of f is x=2 and the line of symmetry for function g is x=1 as the graph starts repeating itself after x=1. Y intercept is the point at which x is 0, for f it is - 5 and for g it is - 6. Rate of change in interval [2,4] is given by (f(4)-f(2))/2=2 for f and for g it is, (g(4)-g(2))/2=-4
The true statements are:
The line of symmetry for function f is x = 2The line of symmetry for function g is x = 1The y-intercept of function f is -5The y-intercept of function g is -6Over the interval [2, 4], the average rate of change of function f is half the average rate of change of function g.Line of SymmetryThis is the point where the function is divided into equal halves.
From the figure, the table and graph are divided at points x = 2, and x = 1.
So, the line of symmetry for function f is x = 2 and the line of symmetry for function g is x = 1
Y-InterceptThis is the point where the function has an x value of 0
From the figure, the y values when x = 0 are -5 and -6
So, the y-intercept of function f is -5 and the y-intercept of function g is -6
Average rate of changeThis is calculated as:
[tex]m = \frac{y_2 - y_1}{x_2 -x_1}[/tex]
For function f, we have:
[tex]m = \frac{-5 + 9}{4-2}[/tex]
[tex]m = \frac{4}{2}[/tex]
[tex]m = 2[/tex]
For function g, we have:
[tex]m = \frac{2+ 6}{4-2}[/tex]
[tex]m = \frac{8}{2}[/tex]
[tex]m = 4[/tex]
By comparison,
[tex]m_f = 0.5 \times m_g[/tex]
Hence, over the interval [2, 4], the average rate of change of function f is half the average rate of change of function g.
Read more about functions and graphs at:
https://brainly.com/question/13136492
3 coins Priya spends $45 on gas, $10 on dinner, and $8 on a video game. How much money did Priya spend on variable expenses?
Answer:
3x=63
Step-by-step explanation:
3 coins means a coin is x and total expenditure is equal to 63
Find the slope of the line passing through the points (9, 1) and (9,-4).
Answer:
slope is undefined
Step-by-step explanation:
(9, 1 ) and (9, - 4 )
Since the x- coordinates of the 2 points are 9, then the line is vertical and parallel to the y- axis with slope being undefined.
Slope is the change in y over the change in x.
Slope = (-4 - 1) / (9 -9) = -5/0 you cannot divide by 0,so the slope is undefined. This means it is a vertical line
solve for x ! please help . (show work)
Answer:
x = -3
Step-by-step explanation:
12 - 4x-5x = 39
Combine like terms
12 - 9x = 39
subtract 12 from each side
12 -9x-12 = 39-12
-9x = 27
Divide by -9
-9x/-9 = 27/-9
x = -3
Question 6 of 11 Step 1 of 6 No Time Limit The table below gives the list price and the number of bids received for five randomly selected items sold through online auctions. Using this data, consider the equation of the regression line, û = bo + bjx, for predicting the number of bids an item will receive based on the list price. Keep in mind, the correlation coefficient may or may not be statistically significant for the data given. Remember, in practice, it would not be appropriate to use the regression line to make a prediction if the correlation coefficient is not statistically significant.
Price in Dollars 23 34 44 46 50
Number of Bids 1 2 4 9 10
Step 1 of 6: Find the estimated slope. Round your answer to three decimal places.
The estimated slope is approximately 2.344
The given table is presented as follows;
[tex]\begin{array}{ccc}Number \ of Bids &&Price \ in \ Dollars\\1&&23\\2&&34\\4&&44\\9&&46\\10&&50\end{array}[/tex]
The regression line formula to be considered = [tex]\bar u = b_0 + b\cdot \bar x[/tex]
The required parameter is;
The estimated slope
The method to find the estimate slope;
The least squares regression formula (method) is presented as follows;
[tex]\bar u = b_0 + b\cdot \bar x[/tex]
Where;
b₀ = The y-intercept
[tex]\mathbf{ b = \dfrac{\sum \left(x_i - \bar x\right) \times \left(u_i - \bar u\right) }{\sum \left(x_i - \bar x\right )^2 } = The \ estimated \ slope}[/tex]
From MS Excel, we have;
[tex]\bar x[/tex] = 5.2, [tex]\bar u[/tex] = 39.4
[tex]\sum \left(x_i - \bar x\right) \times \left(u_i - \bar u\right)[/tex] = 156.6
[tex]{\sum \left(x_i - \bar x\right )^2 }[/tex] = 66.8
Therefore;
The estimated slope, b = 156.6/66.8 ≈ 2.344 (by rounding the answer to three decimal places)
Learn more about regression line here;
https://brainly.com/question/23528764
Question Which of the following is a benefit of using email to communicate at work ? a) You can express yourself in a limited number of characters b) You don't have to worry about using proper grammar. c) You always get a response right away. d ) You can reach a large audience with one communication .
Answer:
d) you can reach a large audience with one communication
Step-by-step explanation:
common sense
if 7a - 11b = 0, what will be the value of a:b
Answer:
11:7
Step-by-step explanation:
Solution
Here
7a-11b=0
a:b=?
we know that
a=7
b=11
ans =11:7
Hence proved
Answer:
[tex]thank \: you[/tex]