Answer:
54% ...
Step-by-step explanation:
this is the answer I guess
The confidence level that produces the widest interval is the one with the highest percentage, which is 54%.
Option B is the correct answer.
What is z-score?A z-score also called a standard score is a measure of how many standard deviations a data point is away from the given mean of a distribution.
It measures the unusual or extreme a particular data point is compared to the rest of the distribution
We have,
The width of a confidence interval is proportional to the critical value of the corresponding confidence level.
The critical value is determined by the standard normal distribution or t-distribution, depending on the sample size and whether the population standard deviation is known.
In general,
The wider the confidence interval, the less precise the estimate of the population means.
Therefore, we want to choose the confidence level that produces the widest interval, which corresponds to the largest critical value.
For a given sample size,
The critical value increases as the confidence level increases.
For example, the critical value for a 95% confidence level is larger than the critical value for a 90% confidence level.
Therefore,
The confidence level that produces the widest interval is the one with the highest percentage, which is 54%.
Learn more about z-score here:
https://brainly.com/question/15016913
#SPJ7
A map has a scale in which 1.25 inches represents 250 miles.
How many miles does 1 inch represent?
Answer: 200 miles
Work Shown:
(1.25 inches)/(250 miles) = (1 inch)/(x miles)
(1.25)/(250) = 1/x
1.25x = 250*1 ..... cross multiplication
1.25x = 250
x = 250/(1.25)
x = 200 miles
Find RS. Can anyone help?
The segment XT splits the trapezoid exactly in half. The average of RS and Q will give us XT because of the properties of a trapezoid.
We find the area of a trapezoid by averaging the bases as well.
RS + Q / 2 = XT
RS + 26 / 2 = 22
RS + 26 = 44
RS = 18
Hope this helps!
Ten pairs of points yielded a correlation coefficient r of 0.790. If a =0.05, which of the following statements is correct if H.: P = 0? (Do not calculate a t-value.) A) Because 0.790 is greater than 0.632, the nullliy pothesis is not rejected. Because 0.790 is greater than 0.602, che null hypothesis is not rejected. Because 0.790 is greater than 0.632, che null hypothesis is rejected. OD) There is no correlation between the variables
Step-by-step explanation:
Ten pairs of points yielded a correlation coefficient r of 0.790. If a =0.05, which of the following statements is correct if H.: P = 0? (Do not calculate a t-value.) A) Because 0.790 is greater than 0.632, the nullliy pothesis is not rejected. Because 0.790 is greater than 0.602, che null hypothesis is not rejected. Because 0.790 is greater than 0.632, che null hypothesis is rejected. OD) There is no correlation between the variables
Bus X and bus y traveled the same 80-mile route. If bus X took 2 hours and bus y traveled at an average speed that was 50 percent faster than the average speed of bus X, how many hours did bus y take to travel the route?
Answer:
1 hr , 18 mins
Step-by-step explanation:
that is the procedure above
help PLSS HELP ASAP
TAN^2 X + SQRT3 TAN X =[0}
Answer:
Step-by-step explanation:
[tex]tan^2x+\sqrt{3} tanx=0\\tanx(tanx+\sqrt{3} )=0\\either~tan~x=0=tan~n\pi \\x=n\pi \\where~n~is~an~integer.\\if~x \in[0,2\pi )\\then~x=0,\pi \\or\\tan~x+\sqrt{3} =0\\tan~x=-\sqrt{3}=tan~(\pi-\frac{\pi }{3} ),tan~(2\pi -\frac{\pi }{3} )\\tan~x=tan(\frac{2\pi}{3} ),tan(\frac{5\pi}{3} )\\x=\frac{2\pi }{3},\frac{5\pi }{3}[/tex]
By which number should (2/5)^-3 be multiplied to get (1/2)^4 as a product ?
Answer:
[tex]\frac{2}{5}^{-3}[/tex]×[tex]x=\frac{1}{2}^{4}[/tex]
[tex]x=\frac{2}{5} ^{3} \\[/tex]×[tex]\frac{1}{2}^{4}[/tex]
(negative in the exponent means reciprocal of the fraction)
x= [tex]\frac{1}{250}[/tex]
Brainliest please
what is the length of a rectangular solid with a volume of 180 cu ft, if it is 9 ft high and 4ft wide?
Answer:
5 ft
Step-by-step explanation:
The formula for Volume is V=lwh, or Volume = length x width x height.
The equation would be:
[tex]180=l(4)(9)[/tex]
or
[tex]180=36l[/tex]
To find the answer, divide by 36.
[tex]\frac{180}{36} =\frac{36l}{36}[/tex]
[tex]5=l[/tex]
The following expression gives an approximate value of the total average credit card debt in a U.S. household (in dollars) t years after 1995.
400t + 5750
Use this expression to predict what the total average credit card debt will be in the year 2025.
Answer: In the year 2025, the total average credit card debt for a U.S. household will be ------------ dollars.
Answer:
In 2025, t=30. so D=418*30+6000 = 18540
An automobile assembly line operation has a scheduled mean completion time, , of minutes. The standard deviation of completion times is minutes. It is claimed that, under new management, the mean completion time has decreased. To test this claim, a random sample of completion times under new management was taken. The sample had a mean of minutes. Can we support, at the level of significance, the claim that the mean completion time has decreased under new management
The question is incomplete. The complete question is :
An automobile assembly line operation has a scheduled mean completion time, μ, of 15.5 minutes. The standard deviation of completion times is 1.7 minutes. It is claimed that, under new management, the mean completion time has decreased. To test this claim, a random sample of 90 completion times under new management was taken. The sample had a mean of 15.4 minutes. Can we support, at the 0.1 level of significance, the claim that the mean completion time has decreased under new management?
Solution :
The given data :
n = 90
μ = 15.5
σ = 1.7
[tex]$\overline x$[/tex] = 15.4
So, the null hypothesis is : [tex]$H_0: \mu = 15.5$[/tex] is been tested against
Alternate hypothesis : [tex]$H_1 : \mu < 15.5 $[/tex] (one-tailed test)
Since, the sample size is sufficiently large and the sample deviation is known, we use the Z-test.
Under this test, the test statistic is given as :
[tex]$Z=\frac{\overline x - \mu}{\sigma/\sqrt{n}} \sim N(0,1)$[/tex]
Under [tex]H_0[/tex], we have
[tex]$Z_0=\frac{\overline x - \mu}{\sigma/\sqrt{n}} $[/tex]
[tex]$Z_0=\frac{15.4-15.5}{1.7/\sqrt{90}} $[/tex]
[tex]$Z_0=-0.56$[/tex]
The critical value for the test is [tex]$Z_{\alpha} = Z_{0.1} = -1.28$[/tex]
We observe that (-0.56 > -1.28), and so we fail to reject the null hypothesis.
No, there is no evidence to support the claim that the mean completion time has decreased.
Thus, we conclude that the mean completion time is 15.5 minutes.
Find the distance between the points: (-1, 5) and (3, -3). In your final answer, include the formula and calculations that you used to find the distance.
Answer:
[tex]4\sqrt{5}[/tex] units
Step-by-step explanation:
The distance between any two points on the x y plane (a,b) and (c,d) has one of two formulas. [tex]\sqrt{(a-c)^2+(b-d)^2}[/tex] or [tex]\sqrt{(c-a)^2+(d-b)^2}[/tex] if you use c-a you have to also use d-b, and the other way around for a-c and b-d. You can rearrange which order you add though. So with (-1,5) and (3,3) here is the math
[tex]\sqrt{(3-(-1))^2+((-3)-5)^2} \\\sqrt{4^2+(-8)^2} \\\sqrt{16+64}\\\sqrt{80}[/tex]
You could simplify this to [tex]4\sqrt{5}[/tex]
Let me know if there was anything you didn't understand.
A technology company is forming a task force of six members to deal with urgent quality issues. The positions will be filled by randomly chosen qualified applicants. The qualified applicants consist of five managers and ten engineers.
Required:
a. What is the probability that the chosen applicants are either all managers or all engineers?
b. What is the probability that the number of managers is the same as the number of engineers on the task force?
c. What is the expected number of engineers chosen?
d. What is the probability that at least one manager is chosen for the task force?
Answer:
a. 0.042 = 4.2% probability that the chosen applicants are either all managers or all engineers.
b. 0.2398 = 23.98% probability that the number of managers is the same as the number of engineers on the task force.
c. The expected number of engineers chosen is 4.
d. 0.958 = 95.8% probability that at least one manager is chosen for the task force.
Step-by-step explanation:
The positions are chosen without replacement, which means that the hypergeometric distribution is used to solve this question.
Hypergeometric distribution:
The probability of x successes is given by the following formula:
[tex]P(X = x) = h(x,N,n,k) = \frac{C_{k,x}*C_{N-k,n-x}}{C_{N,n}}[/tex]
In which:
x is the number of successes.
N is the size of the population.
n is the size of the sample.
k is the total number of desired outcomes.
Combinations formula:
[tex]C_{n,x}[/tex] is the number of different combinations of x objects from a set of n elements, given by the following formula.
[tex]C_{n,x} = \frac{n!}{x!(n-x)!}[/tex]
In this question:
5 + 10 = 15 applicants, which means that [tex]N = 15[/tex]
10 are engineers, which means that [tex]k = 10[/tex]
Six members are chosen, which means that [tex]k = 6[/tex]
a. What is the probability that the chosen applicants are either all managers or all engineers?
Not possible having all managers(five applicants are manager, while there are 6 open positions), so this is P(X = 6), that is, all engineers.
[tex]P(X = x) = h(x,N,n,k) = \frac{C_{k,x}*C_{N-k,n-x}}{C_{N,n}}[/tex]
[tex]P(X = 6) = h(6,15,6,10) = \frac{C_{10,6}*C_{5,0}}{C_{15,6}} = 0.042[/tex]
0.042 = 4.2% probability that the chosen applicants are either all managers or all engineers.
b. What is the probability that the number of managers is the same as the number of engineers on the task force?
3 engineers, so this is P(X = 3).
[tex]P(X = x) = h(x,N,n,k) = \frac{C_{k,x}*C_{N-k,n-x}}{C_{N,n}}[/tex]
[tex]P(X = 3) = h(3,15,6,10) = \frac{C_{10,3}*C_{5,3}}{C_{15,6}} = 0.2398[/tex]
0.2398 = 23.98% probability that the number of managers is the same as the number of engineers on the task force.
c. What is the expected number of engineers chosen?
The expected value of the hypergeometric distribution is:
[tex]E(X) = \frac{nk}{N}[/tex]
So
[tex]E(X) = \frac{6(10)}{15} = 4[/tex]
The expected number of engineers chosen is 4.
d. What is the probability that at least one manager is chosen for the task force?
At most five engineers, which is:
[tex]P(X \leq 5) = 1 - P(X = 6)[/tex]
Since in item a. we already have P(X = 6).
[tex]P(X \leq 5) = 1 - 0.042 = 0.958[/tex]
0.958 = 95.8% probability that at least one manager is chosen for the task force.
Find the missing pieces of the triangle round to the nearest tenth
Answer:
8√3
Step-by-step explanation:
Missing side,
√(19²-13³)
= 8√3
Answered by GAUTHMATH
Linda leaves the school to go home. She walks 7 blocks south and then 9 blocks east. how far is Linda from her office?
A.8 blocks
B.11.5 blocks
C.20 blocks
D.14 blocks
Answer:
B. 11.5
Step-by-step explanation:
That missing length can be solved via the equation a^2+b^2=c^2, where the hypotenuse is c. We know A and B, which is 7 and 9.
7^2+9^2=130
sqrt 130 is 11.4017543
Here, you kinda have to break the rules of rounding to say that it is B.
There could be a more efficient route for resolving this answer, but this is the method that I was taught.
What is the equation of the midline for the function f(x)?
f(x)=12sin(x)+3
Enter your answer in the box.
9514 1404 393
Answer:
f(x) = 3
Step-by-step explanation:
Replace sin(x) with 0 and you will have it.
f(x) = 12·0 +3
f(x) = 3
Answer:
y= 3
Step-by-step explanation:
I took the test
For a two-tailed test with a sample size of 20 and a .20 level of significance, the t value is _____. Selected Answer: d. 1.328
Answer:
1.328
Step-by-step explanation:
Given :
Sample size, n = 20.
Degree of freedom, df = n - 1
df = 20 - 1 = 19
α = 0.2
Using the T-distribution calculator :
Since it is two - tailed:
Tα/2 ; 19 = T0.2/2 ; 19 = T0.1, 19 = 1.3277 = 1.328
Using a t-distribution calculator, it is found that the t-value is of t = 1.328.
How to find the critical value of the t-distribution?In a calculator, these following inputs are needed:
The number of degrees of freedom, which is one less than the sample size.The level of significance.Whether the test is one-tailed or two-tailed.In this problem, inputting the data given in a calculator, it is found that the t-value is of t = 1.328.
More can be learned about the t-distribution at https://brainly.com/question/13873630
T is the midpoint of pq where pt=3x-3 and tq=5x-7 find x
Answer: x = 2
Step-by-step explanation:
P-----------------------T----------------------Q
(3x-3) (5x-7)
Since T is the midpoint we know that PT and TQ are equal
Just solve the equation: 3x-3 = 5x-7
[tex]3x-3 = 5x-7[/tex]
now move the x to one side
[tex]-3 = 2x-7[/tex] (I subtracted the 3x)
then get the 2x by itself
[tex]4=2x[/tex]
lastly, divide by 2 to get x by itself
[tex]x=2\\[/tex]
PLEASE HELP ANSWER THISS!!! I NEED THIS PLEASE!!! AND NO LINKS EITHER PLSS!!
It doesn't change because to add fractions, you need a common denominator. To find it, they multiplied 1/3 by 2 to make 2/6, to add to the 3/6.
A department store mails a customer satisfaction survey to people who make credit card purchases at the store. This month, 3521 people made credit card purchases. Surveys are mailed to 278 of these people, chosen at random, and 172 people return the survey form. Identify the population and the sample.
Answer:
The population is the population of 3521 people who made credit card purchases.
The sample is the 172 people who returned the survey form.
Step-by-step explanation:
Department mails customers satisfactions forms to those who make credit cards purchase at the store, totaling 3521 people. Thus, the population is the population of 3521 people who made credit card purchases.
Surveys are mailed to 278 of these people, chosen at random, and 172 people return the survey form.
Thus the sample, that is, those from whom the data will be taken and expanded to the rest of the population, is the 172 people who returned the survey form.
The population is all 3521 people who made credit card purchases.
The sample is the 172 people who returned the survey form.
In the figure, triangles ABC and DEF are congruent.
Find the measure of DF.
a. 13m
b. 12m
c. 7m
d. 13.928m
Find the solution(s) of the system of equations. y = x2 + 4x y + x2 = –4x Question 7 options: A) (–4, 0) and (0, 0) B) (0, 0) C) (–4, 0) and (4, 0) D) (0, 0) and (4, 0)
Answer:
Hello,
Answer A (-4,0) and (0,0)
Step-by-step explanation:
[tex]\left\{\begin{array}{ccc}y&=&x^2+4x\\y+x^2&=&-4x\\\end{array} \right.\\\\\\\left\{\begin{array}{ccc}y&=&x^2+4x\\y&=&-x^2-4x\\\end{array} \right.\\\\\\\left\{\begin{array}{ccc}y&=&x^2+4x\\x^2+4x&=&-x^2-4x\\\end{array} \right.\\\\\\\left\{\begin{array}{ccc}2*x^2+8*x&=&0\\y&=&x^2+4x\\\end{array} \right.\\\\\\\left\{\begin{array}{ccc}x(x+4)&=&0\\y&=&x^2+4x\\\end{array} \right.\\\\\\[/tex]
[tex]\left\{\begin{array}{ccc}x&=&0 \\y&=&0\\\end{array} \right. \ or\ \left\{\begin{array}{ccc}x&=&-4 \\y&=&0\\\end{array} \right.[/tex]
Bobby wants to bring popsicles to a summer barbecue. He decides to try a new recipe for pineapple-orange popsicles, so he makes a small batch with 1 cup of pineapple juice and 3 cups of orange juice to taste. He likes the combination, so he uses 3 cups of pineapple juice and 7 cups of orange juice to make a larger batch for the barbecue. Which batch of popsicles tastes more like oranges?
Answer:The first would taste more like oranges
Step-by-step explanation:
1+log2=log(x+1)
I know that x=19 but how do you get 19?
Step-by-step explanation:
Recall that [tex]\log 10 = 1[/tex] so we can rewrite the equation above as
[tex]\log 10 + \log 2 = \log (x + 1)[/tex]
Also recall that [tex]\log(ab) = \log a + \log b[/tex] so the left-hand side becomes
[tex]\log [(10)(2)] = \log (x + 1)[/tex]
or
[tex]20 = x + 1 \Rightarrow x = 19[/tex]
what is the radius of a circle in it in if the area is 36m²?
A.0.339 m
B.3.39 m
C.78.5 m²
D.339 m
Answer:
B. 3.39 m
Step-by-step explanation:
r² = A/π
= 36/3.14
= 11.465
r = √11.465 = 3.39
What are the zeroes of f(x) = x2 - X - 2?
x= -2,1
x = 2, -1
x= -2, -1
x = 2,1
Answer:
x=2 x=-1
Step-by-step explanation:
f(x) = x^2 - X - 2
0= x^2 -x-2
Factor
0 =(x-2)(x+1)
Using the zero product property
x-2 =0 x+1 =0
x=2 x=-1
Answer:
x=2, -1
Step-by-step explanation:
Hi there!
We want to find the zeros of this function: f(x)=x²-x-2
The zeros are the values of x that will make f(x)=0
So that means in order to find the zeros, set f(x) as 0
In that case,
x²-x-2=0
Now let's solve the quadratic equation
We can do it by factoring
-x is the sum of two numbers, while -2 is the product of those two same numbers
Now think: which two numbers add up to -1, but multiply to get -2?
Those numbers are -2 and 1
Now factor the polynomial by FOIL:
(x-2)(x+1)=0
Split and solve
x-2=0
x=2
x+1=0
x=-1
The zeros are x=2, -1
Hope this helps!
please help me please help i will give up vote and 5 star please and follow
Answer:
C. y = 4x, table B, graph A
Step-by-step explanation:
Charges = $4 per hour (this is the slope, m,)
m = 4
The equation can be represented in the form of y = mx
Where,
m = slope = 4
Substitute m = 4 into y = mx
Thus:
y = 4x
✔️The table that represents the equation y = 4x showing that for 1 hour, the charges is $4 is table B (x = 1, y = 4).
Table B represents the parking cost.
✔️The equation with a slope of 4 is the equation that represents the parking cost. Thus, in graph A, when x = 1 (hour), y = 4 (cost).
Therefore, graph A is the answer.
one month is what percentage of a year given that there are 7 days in a week, and 12 months in a year
Answer:
it should be 8.333333%
Step-by-step explanation:
Given the parabola below, find the endpoints of the latus rectum. (x-2)^2=-20(y+2)
Answer:
The endpoints of the latus rectum are [tex](12, -7)[/tex] and [tex](-8, -7)[/tex].
Step-by-step explanation:
A parabola with vertex at point [tex]C(x, y) = (h,k)[/tex] and whose axis of symmetry is parallel to the y-axis is defined by the following formula:
[tex](x-h)^{2} = 4\cdot p \cdot (y-k)[/tex] (1)
Where:
[tex]y[/tex] - Independent variable.
[tex]x[/tex] - Dependent variable.
[tex]p[/tex] - Distance from vertex to the focus.
[tex]h[/tex], [tex]k[/tex] - Coordinates of the vertex.
The coordinates of the focus are represented by:
[tex]F(x,y) = (h, k+p)[/tex] (2)
The latus rectum is a line segment parallel to the x-axis which contains the focus. If we know that [tex]h = 2[/tex], [tex]k = -2[/tex] and [tex]p = -5[/tex], then the latus rectum is between the following endpoints:
By (2):
[tex]F(x,y) = (2, -2-5)[/tex]
[tex]F(x,y) = (2,-7)[/tex]
By (1):
[tex](x-2)^{2} = -20\cdot (-7+2)[/tex]
[tex](x-2)^{2} = 100[/tex]
[tex]x - 2 = \pm 10[/tex]
There are two solutions:
[tex]x_{1} = 2 + 10[/tex]
[tex]x_{1} = 12[/tex]
[tex]x_{2} = 2-10[/tex]
[tex]x_{2} = -8[/tex]
Hence, the endpoints of the latus rectum are [tex](12, -7)[/tex] and [tex](-8, -7)[/tex].
Please help me with this question.
Answer:
B
Step-by-step explanation:
In a triangle, the sum of any two sides must be bigger than the third.
For the first one, 10+20=30 is not greater than 30, so this is not correct.
For B, 122+137 = 259 > 257, 257+137>122 , and 257 + 122 > 137. This works
For C, 8.6 + 2.7 = 11.3 < 12.2, so this does not work
For D, 1/6 + 1/5 = 5/(6*5) + 6/(6*5) = 5/30 + 6/30 = 11/30 < 1/2 = 15/30, so this does not work
Choose the correct solution for the given equation x^2-6x=40
Answer:
10,-4
Step-by-step explanation:
not sure where the options are but if you were to solve this equation first bring everything to one side.
x^2 - 6x - 40 = 0
factor it
(x-10)(x+4) = 0
set each part to 0
x-10 = 0 and x+4 = 0
solutions are 10 and -4
jill number has a prime factorization with 6 numbers. Jamal number had a prime factorization with 3 numbers. Whos is bigger. jill says hers is but jamal jays not true explain.
Answer:
not enough information
Step-by-step explanation:
jill could have 2*2*2*2*2*2
and Jamal 113*113*113
but if Jill's number is made from all high primes and Jamals from low ones, it's vice versa