Answer:
The Answer of the above question is 30.25
Step-by-step explanation:
Hope it helps you.
please help I have 3 mins left
Answer:
the first one is 3.7 x 10^-4
and the second one is 3.7 x 10^4
explanation:
when we have decimals we are going backward,
therefore "0.00037" would be a negative number
to find the scientific notation form, we have to move the decimal over to the left untill we get 3.7
it took 4 moves to the right to get to 3.7, and since were dealing with decimals it will be negative,
so the first one is 3.7 x 10^4
the second one however is not a decimal so it will be a positive exponent.
now remember that there is always a decimal after a number we might just not see it.
so, going from the very end of the number it takes us 4 moves to the left to get to 3.7
so,
the second one will be 3.7 x 10^4
hope this helped :)
Question 17 of 25
Solve the inequality. Enter the answer as an inequality that shows the value of
the variable; for example f>7, or 6 < w. Where necessary, use <= to write s
and use >= to write .
V-(-5) <-9
Answer here
I
SUBMIT
Answer:
v-(-5)<-9
v- remove brackets -5
v- -5= -4 +5 ( opposite operation)
v- = -4
v< -4
please help! 50 points!
Answer:
a) forming a bell
b) 5
c) 4.7
d) mean
is the correct answer
pls mark me as brainliest
Can someone please help me with this math problem
We have [tex]f\left(f^{-1}(x)\right) = x[/tex] for inverse functions [tex]f(x)[/tex] and [tex]f^{-1}(x)[/tex]. Then if [tex]f(x) = 2x+5[/tex], we have
[tex]f\left(f^{-1}(x)\right) = 2f^{-1}(x) + 5 = x \implies f^{-1}(x) = \dfrac{x-5}2[/tex]
Then
[tex]f^{-1}(8) = \dfrac{8-5}2 = \boxed{\dfrac32}[/tex]
The principle
P=6000 A=6810 T=3 years
Answer:
incomplete question
Step-by-step explanation:
that is what is wrong with your question
Answer:
r = 4.3%
Step-by-step explanation:
6810= 6000(x)^3
6810/6000= (x)^3
x = 1.043114431
r = 043114431
What does si mean in temperature
Answer:
The kelvin (abbreviation K), also called the degree Kelvin (abbreviation, o K), is the SI unit of temperature. One Kelvin is 1/273.16 (3.6609 x 10 -3 ) of the thermodynamic temperature of the triple point of pure water (H 2 O). The ampere (abbreviation, A) is the SI unit of electric current.
Answer:
kelvin is si unit of tempreature
HURRY PLEASE!!!!!!
Line AB has a slop of 1/2
What would the slope of line CD have to be if we knew CD was perpendicular to AB?
2
-2
1/2
-1/2
Answer:
-2
Step-by-step explanation:
Perpendicular lines have slopes that are negative reciprocals
Take the slope of AB = 1/2
-1/(1/2)
-1 * 2/1
-2
The slope of a line perpendicular is -2
PLEAZE HELPPPPPPPSPPSPAP
Answer:
Step-by-step explanation:
345ftyfthftyft.plk,k,
Answer:
Hello,
Anwser is C
Step-by-step explanation:
[tex]y=log_9(12x)\\\\9^y=12x\\\\9^x=12y\ inverting \ x \ and \ y \\\\y=\dfrac{9^x}{12} \\[/tex]
A particle is moving such that its height h at time t is given by h(t) = 2 + 8t - 3t^2 + 1/5t^3. The average velocity of the particle on the period [0,3] is
[tex]\\ \Large\sf\longmapsto h(t)[/tex]
[tex]\\ \Large\sf\longmapsto 2+8t-3t^2+\dfrac{1}{5}t^3[/tex]
[tex]\\ \Large\sf\longmapsto 2+8(3)-3(3)^2+\dfrac{1}{5}(3)^3[/tex]
[tex]\\ \Large\sf\longmapsto 2+24-3(9)+\dfrac{27}{5}[/tex]
[tex]\\ \Large\sf\longmapsto 26-27+5.4[/tex]
[tex]\\ \Large\sf\longmapsto -2+5.4[/tex]
[tex]\\ \Large\sf\longmapsto h(t)=3.4m[/tex]
Need the answer please, soon as possible
9514 1404 393
Answer:
(d) 27.4%
Step-by-step explanation:
The desired percentage is ...
(juniors for Kato)/(total juniors) × 100%
= 129/(129 +194 +147) × 100%
= (129/470) × 100% ≈ 27.4%
About 27.4% of juniors voted for Kato.
The sum of 'n' terms of an arithmetic sequence is 4n^2+3n. What is the first term, the common difference, and the sequence?
Answer:
d=8 and a=7
Step-by-step explanation:
The sum of a arithmetic sequence is given by (n/2)*(2a+(n-1)d). Comparing coefficients with the given Sn, we have; a-d/2=3 and d/2=4, d=8 and a=7. The sequence is 7, 15, 23, 31, 39
please help this is due soon
Coefficient and degree of the polynomial
Answer:
The leading coefficient is -8 as it is a mix of x and cardinal, if it was x alone then it wouldn't be the coefficient, we would use the next number shown.
If it was just a number and no x then it would still be the coefficient.
The degree is 9 as it is the highest power shown.
Step-by-step explanation:
See attachment for examples
The figure shows an equilateral triangle with its sides as indicated. find the length of each side of the triangle .
I Will Mark Brainliest
Answer:
21
Step-by-step explanation:
All three sides are equal
2x-7 = x+y-9 = y+5
Using the last two
x+y-9 = y+5
Subtract y from each side
x+y-9-y = y+5-y
x-9 = 5
Add 9 to each side
x -9+9 = 5+9
x=14
We know the side length is
2x-7
2(14) -7
28-7
21
The side length is 21
2. Solve the following:
a. When six is added to four times a number the result is 50. Find the number.
b. The sum of a number and nine is multiplied by -2 and the answer is -8. Find the
number
10
m in
Step-by-step explanation:
a) let number=x
four times a number=4x
Condition:
4x+6=50
4x=50-6
4x=44
x=44/4
x=11
b) Condition:
x+9×-2=-8
x-18=-8
x=-8+18
x=10
Note:if you need to ask any question please let me know.
A construction crane lifts a bucket of sand originally weighing 145 lbs at a constant rate. Sand is lost from the bucket at a constant rate of .5lbs/ft. How much work is done in lifting the sand 80ft?
Answer: [tex]10,000\ lb.ft[/tex]
Step-by-step explanation:
Given
Initial weight of the bucket is [tex]145\ lb[/tex]
It is lifted at constant rate and rate of sand escaping is [tex]0.5\ lb/ft[/tex]
At any height weight of the sand is [tex]w(h)=145-0.5h[/tex]
Work done is given by the product of applied force and displacement or the area under weight-displacement graph
from the figure area is given by
[tex]\Rightarrow W=\int_{0}^{80}\left ( 145-0.5h \right )dh\\\\\Rightarrow W=\left | 145h-\dfrac{0.5h^2}{2} \right |_0^{80}\\\\\Rightarrow W=\left [ 145\times 80-\dfrac{0.5(80))^2}{2} \right ]-0\\\\\Rightarrow W=11,600-1600\\\\\Rightarrow W=10,000\ lb.ft[/tex]
Find the sum of ∑3/k=0 k^2
Answer:
[tex]14[/tex]
Step-by-step explanation:
Given
[tex]\displaystyle \sum_{k=0}^3k^2[/tex]
Let's break down each part. The input at the bottom, in this case [tex]k=0[/tex], is assigning an index [tex]k[/tex] at a value of [tex]0[/tex]. This is the value we should start with when substituting into our equation.
The number at the top, in this case 3, indicates the index we should stop at, inclusive (meaning we finish substituting that index and then stop). The equation on the right, in this case [tex]k^2[/tex], is the equation we will substitute each value in. After we substitute our starting index, we'll continue substituting indexes until we reach the last index, then add up each of the outputs produced.
Since [tex]k=0[/tex] is our starting index, start by substituting this into [tex]k^2[/tex]:
[tex]0^2=0[/tex]
Now continue with [tex]k=1[/tex]:
[tex]1^1=1[/tex]
Repeat until we get to the ending index, [tex]k=3[/tex]. Remember to still use [tex]k=3[/tex] before stopping!
Substituting [tex]k=2[/tex]:
[tex]2^2=4[/tex]
Substituting [tex]k=3[/tex]:
[tex]3^2=9[/tex]
Since 3 is the index we end at, we stop here. Now we will add up each of the outputs:
[tex]0+1+4+9=\boxed{14}[/tex]
Therefore, our answer is:
[tex]\displaystyle \sum_{k=0}^3k^2=0+1+4+9=\boxed{14}[/tex]
Answer:
14
Step-by-step explanation:
∑3/k=0 k^2
Let k=0
0^2 =0
Let k = 1
1^2 =1
Let k =2
2^2 = 4
Let k = 3
3^2 = 9
0+1+4+9 = 14
Find the area of the shape shown below.
Answer:
28 units²
Step-by-step explanation:
Area of trapezoid =
2(8 + 4)/2 = 12
Area of rectangle =
2 x 8 = 16
16 + 12 = 28
If my answer is incorrect, pls correct me!
If you like my answer and explanation, mark me as brainliest!
-Chetan K
Domain and range of g(x)= 5x-3/2x+1
Solve for domain and range?
What is the volume of the cylinder below?
Height 4
Radius 7
Answer:
V ≈ 615.75
r Radius 7
h Height 4
Here's the result of this question
The point (-2,7) has undergone the following transformations:
1. Translated 1 unit up and 4 units left
Then
2. Reflected about the c-axis
Then
3. Rotated 90° anticlockwise about the origin
A) Its final coordinates are (3,-1)
B) Its final coordinates are (8,-6)
C) Its final coordinates are (-8,6)
D) Its final coordinates are (-3,1)
Answer:
B) Its final coordinates are (8,-6)
Step-by-step explanation:
1. Translated 1 unit up and 4 units left
(-2,7) becomes (-6, 8)
2. Reflected about the x-axis
(-6,8) becomes (-6, -8)
3. Rotated 90° anticlockwise about the origin
(-6, -8) becomes (8, -6) because when rotating 90 degrees anticlockwise about the origin, point A (x,y) becomes point A' (-y,x). In other words, switch the x and y and make y negative.
A $22,000 loan was taken out. If $24,805 is due at the end of the loan after being compounded daily at 2.5%, how many
years was the loan for? (Round to the nearest tenth of a year)
Provide your answer below
9514 1404 393
Answer:
4.8 years
Step-by-step explanation:
Solving the compound interest formula for the number of years gives ...
t = log(A/P)/(n·log(1 +r/n))
where principal P invested at rate r compounded n times per year produces value A after t years.
t = log(24805/22000)/(365·log(1 +0.025/365)) ≈ 4.800
The loan was for 4.8 years.
Answer as soon as you can. a. 162 comes just after b. What comes just before 182. lies in between 99 and 101. c.
Answer:
a. 161
b. 181
c. 100
Step-by-step explanation:
a. 162 comes just after 161 (160, 161, 162, 163...)
b. 181 comes just before 182 (180, 181, 182, 183...)
c. 100 is between 99 and 101 (98, 99, 100, 101, 102...)
Please help!!!!
CE is tangent to this circle, CD is a radius and ECB=48 what is BAC
Answer:
48degrees
Step-by-step explanation:
From the circle geometry shown, traingle BDC is an isosceles triangle which shows means that their base angels are the same. Hence;
<B = <C
<CBD + <BCD + <D = 180
<BCD + <BCD + <D =180
2<BCD + <BDC = 180
Get <BCD;
<BCD+ <ECB = 90
<BCD + 48 = 90
<BCD = 90 - 48
<BCD = 42degrees
Get <BDC
2<BCD + <BDC = 180
2(42)+ <BDC = 180
84 + <BDC = 180
<BDC = 180 - 84
<BDC = 96
Since angle at the centre is twice that at the circumference, then;
<BAC = 1/2(<BDC )
<BAC = 96/2
<BAC = 48degrees
12) Find the angles between 0o and 360o where sec θ = −3.8637 . Round to the nearest 10th of a degree:
Please show all work
9514 1404 393
Answer:
105.0°, 255.0°
Step-by-step explanation:
Many calculators do not have a secant function, so the cosine relation must be used.
sec(θ) = -3.8637
1/cos(θ) = -3.8637
cos(θ) = -1/3.8637
θ = arccos(-1/3.8637) ≈ 105.000013°
The secant and cosine functions are symmetrical about the line θ = 180°, so the other solution in the desired range is ...
θ = 360° -105.0° = 255.0°
The angles of interest are θ = 105.0° and θ = 255.0°.
If 8x+5(3+x)-a=15+5x, then a = ?
Answer:
a = 8x
if you want to find x also, then x = a/8
Step-by-step explanation:
What is the sum of the infinite geometric series?
Answer:
-6
Step-by-step explanation:
a1= -3
r= -(3/2)/-3 = 0.5
r>-3
s= a1/1-r
= -3/1-0.5
=-6
What is the dimension of the null space Null (A) of A =
Answer:
the nullity of a matrix A is the demision of its null space:nullity A = dim (n(A).
7. Solve for x: x/6 - y/3 = 1
Please give steps!
Calls to a customer service center last on average 2.3 minutes with a standard deviation of 2 minutes. An operator in the call center is required to answer 76 calls each day. Assume the call times are independent.
What is the expected total amount of time in minutes the operator will spend on the calls each day?
What is the standard deviation of the total amount of time in minutes the operator will spend on the calls each day? Give your answer to four decimal places.
What is the approximate probability that the total time spent on the calls will be less than 166 minutes? Give your answer to four decimal places. Use the standard deviation as you entered it above to answer this question.
What is the value c such that the approximate probability that the total time spent on the calls each day is less than c is 0.95? Give your answer to four decimal places. Use the standard deviation as you entered it above to answer this question.
Answer:
The expected total amount of time in minutes the operator will spend on the calls each day is of 174.8 minutes.
The standard deviation of the total amount of time in minutes the operator will spend on the calls each day is of 17.4356 minutes.
0.3085 = 30.85% approximate probability that the total time spent on the calls will be less than 166 minutes.
The value c such that the approximate probability that the total time spent on the calls each day is less than c is 0.95 is [tex]c = 203.4816[/tex]
Step-by-step explanation:
Normal Probability Distribution
Problems of normal distributions can be solved using the z-score formula.
In a set with mean [tex]\mu[/tex] and standard deviation [tex]\sigma[/tex], the z-score of a measure X is given by:
[tex]Z = \frac{X - \mu}{\sigma}[/tex]
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
n instances of a normally distributed variable:
For n instances of a normally distributed variable, the mean is:
[tex]M = n\mu[/tex]
The standard deviation is:
[tex]s = \sigma\sqrt{n}[/tex]
Calls to a customer service center last on average 2.3 minutes with a standard deviation of 2 minutes.
This means that [tex]\mu = 2.3, \sigma = 2[/tex]
An operator in the call center is required to answer 76 calls each day.
This means that [tex]n = 76[/tex]
What is the expected total amount of time in minutes the operator will spend on the calls each day?
[tex]M = n\mu = 76*2.3 = 174.8[/tex]
The expected total amount of time in minutes the operator will spend on the calls each day is of 174.8 minutes.
What is the standard deviation of the total amount of time in minutes the operator will spend on the calls each day?
[tex]s = \sigma\sqrt{n} = 2\sqrt{76} = 17.4356[/tex]
The standard deviation of the total amount of time in minutes the operator will spend on the calls each day is of 17.4356 minutes.
What is the approximate probability that the total time spent on the calls will be less than 166 minutes?
This is the p-value of Z when X = 166.
[tex]Z = \frac{X - \mu}{\sigma}[/tex]
For this problem:
[tex]Z = \frac{X - M}{s}[/tex]
[tex]Z = \frac{166 - 174.8}{17.4356}[/tex]
[tex]Z = 0.5[/tex]
[tex]Z = 0.5[/tex] has a p-value of 0.6915.
1 - 0.6915 = 0.3085.
0.3085 = 30.85% approximate probability that the total time spent on the calls will be less than 166 minutes.
What is the value c such that the approximate probability that the total time spent on the calls each day is less than c is 0.95?
This is X = c for which Z has a p-value of 0.95, so X = c when Z = 1.645. Then
[tex]Z = \frac{X - M}{s}[/tex]
[tex]1.645 = \frac{c - 174.8}{17.4356}[/tex]
[tex]c - 174.8 = 1.645*17.4356[/tex]
[tex]c = 203.4816[/tex]
The value c such that the approximate probability that the total time spent on the calls each day is less than c is 0.95 is [tex]c = 203.4816[/tex]